CALL US NOW: (714) 502-9230

Se habla español

Electricity/Power Outages Release


During the fumigation process it is necessary to have electricity turned on at all times to the structures scheduled to be fumigated at the above property address. However, we do not have any control over the electricity or the electricity provider to the property. As a result of this, A-1 Bonded Termite, Inc. and/or A-1 Fumigation Inc. cannot be held responsible in the event of a power outage or the duration of the outage during the fumigation process. Although rare, these outages could cause delays of the fumigation process, items damaged or spoiled and consequential property damage as a result of the outage.

I hereby waive, release, and discharge A-1 Bonded Termite, Inc. and/or A-1 Fumigation Inc. from any and all responsibility and liability for power outages, the duration of the outage during the fumigation process, any delays of the fumigation process, items damaged or spoiled or any and all consequential property damage which may occur as a result of the outage. I have been advised of the risks of power outages that may occur during the fumigation as well as any and all consequential property damage which may develop as a result of the outage at the above mentioned address/structure(s).